
Nationally Significant Infrastructure Project
Vibrock recently provided noise and vibration consultancy services as part of a DCO application for a new 2.5 million cubic metre extension at East Northants Resource Management Facility treatment and disposal site near Peterborough.
The extension will enable the operator Augean to provide a longer-term hazardous waste treatment and disposal solution and extend the site life up to 2046.
Augean’s application for the DCO was brought forward as a Nationally Significant Infrastructure Project (NSIP). Further information is available at: https://augean.co.uk/2023/01/25/enrmf-future/
You Should Know
Vibrock has been involved in projects across Europe and the rest of the world, from the UK to Australia. We are relied upon to provide accurate vibration prediction and monitoring services.
Noise Monitoring
Services.
Our noise monitoring services are in demand from many industries. Noise predictions are carried out using CADNA noise prediction software.
Vibration
Services.
Vibrock have the capability to carry out vibration assessments to ensure compliance with acceptable levels at existing or proposed vibration sensitive sites.
Air Quality
Services.
Our aim is to help our clients manage and reduce emissions. We are experienced in a wide range of sampling techniques and are qualified consultants.


