Vibrock recently provided noise and vibration consultancy services as part of a DCO application for a new 2.5 million cubic metre extension at East Northants Resource Management Facility treatment and disposal site near Peterborough.

The extension will enable the operator Augean to provide a longer-term hazardous waste treatment and disposal solution and extend the site life up to 2046.

Augean’s application for the DCO was brought forward as a Nationally Significant Infrastructure Project (NSIP). Further information is available at: https://augean.co.uk/2023/01/25/enrmf-future/

Leave a Reply

Your email address will not be published. Required fields are marked *